H Electronic Firm
K Technical Firm N Electronic Firm
H Electronic Firm
Design period of the original circuit plate required 3-4 months to run 4-5 times of edition at the merely fair level on quality of product signal, and the product plan was occasionally suspended due to defective PCB
design.
Present
Situation:
1. Design period shortens by 1-2
months
2. R&D cost is spared by
50-75%
3. Quality of product signal shows excellent without interfered by confused wave; stability of the product remains
high-level
4. The product may enter the market by 2-3 months
earlier
5. So far all the products have been smoothly manufactured in large-scale since we cooperated
K Technical Firm
1. Design period of the original circuit plate required 3-4 months or was even unable to be controlled for timetable of entering the
market.
2. Capability of developing high frequency product was
restrained.
Present Situation:1.
1. Design period shortens by 1-2
months
2. R&D cost is spared
by30-65%
3. Quality of product signal shows excellent without interfered by confused wave; stability of the product remains
high-level
4. The product may enter the market by 1-2 months earlier5. Provide help to develop high frequency product
N Electronic Firm
Assist the firm to transform from OEM to
ODM.
1. Unit price of the originally designed product appeared much higher with less
competitiveness
2. The original EMI verification revealed
defective
Present Situation:Re-layout and design to the client’s original product by declining layer number of circuit plate and passed verification over norms like CE, FCC, etc resulted in heightening competitiveness that made score of 2004 Client/Supplier Review Grade reached 110.
|