Mouse-Team

                                                                                                     繁體中文   English   日本語

Mouse-Team

We have extensive experience in High Speed DDR3 Production. We can completely finish in the First Version.

 

IC TESTING

The Electronincs business cycle fluctuating unpredictably, and the IC testing field is one of the first in line to feel the impact. Mouse-Team is making solutions on how to reduce the time from ICdevice layout to PCB-PCBA. To finish a layout in the first version. Mouse-Team provides 24/7 service to this problem. Also providing a turnkey solution with no risk of rework in its work history.

 

IC Test Board

 "Time is money." Reducing the time from IC device planning to PCB design and production is the main goal. We provide Turnkey solutions for this purpose.

 

** Documents Needed for IC test Board**

1. pre form document (ex. Flex, ultraFlex).
2. Load Board Mechanical file.
3. Device Socket Mechanical File.
4. Docking Plane Mechanical file.
5. Device jrss., Dri., fy axi.
6. Instrument Resource.
7. Channel Assigment/ Map.
8. Platform Design/ Layout Guide.

We will follow the test board Design Guideline concerning PCB design fabrication in our design Procedure.

 


Mouse-Team

  

ADD: 10F.-2, No.192, Sec. 2, Zhongxing Rd., Xindian Dist., New Taipei City 23146, Taiwan (R.O.C.)   TEL: 886-2-29113596 ext 100

All right reserved by Mouse-Team